Dallas Design District — air movers in the occupied corridor

Commercial water · Fort Worth

Fort Worth Commercial Water — Corridor Pipe Failure

Cast iron failed in the dirt. Water ran the corridor. We dried it, opened the wet base, and put the walls back.

817-632-2522

Loss

Failed underground/cast-iron fitting. Water into a commercial corridor and adjacent tenant space. Occupied building.

What we found

  • The fitting in the ground had a hole in it. That’s what put water in the building.
  • Corridor base was wet. Drywall came off at the water line so the cavity could dry and get new insulation.
  • Tenants stayed. Contents in the showroom got covered. Work ran in the hall.
  • Rebuild was the wet band: insulation, rock, paint, then wainscot. Not a full-height demo for a base leak.
  1. 01

    Source

    Cast-iron fitting in the dirt. Hole in the casting. Water had a path into the building.

    Fort Worth — failed cast-iron pipe fitting pulled from the excavation
  2. 02

    Dry

    Dehumidifiers, air movers, and HEPA in the corridor. Occupied building. Equipment on the wet path.

    Fort Worth — drying equipment running in a commercial corridor
  3. 03

    Open

    Drywall off at the water line. Cavity open. Insulation showing. That’s how you dry a base leak.

    Fort Worth — corridor base opened to insulation after water damage
  4. 04

    Rebuild

    New insulation, new rock at the wet band, paint, then millwork. The hall stays a hall.

    Fort Worth — crew hanging drywall at the base of a commercial corridor
  5. 05

    Finish

    Paint and wainscot back. The wet band is gone.

    Fort Worth — finished painted wainscot after commercial water reconstruction

What we did

Air movers. Dehumidifiers. HEPA scrubbers. Selective demo. Insulation, drywall, paint.

Result

Corridor dry, base rebuilt, paint and millwork back. The building kept operating.

Call 817-632-2522 · Request a callback · Commercial restoration · Drying

From this job

  • Dallas Design District — air movers in the occupied corridor

    Dallas Design District — air movers in the occupied corridor

  • Dallas Design District — dehumidifier on the corridor drying path

    Dallas Design District — dehumidifier on the corridor drying path

  • Dallas Design District — drying equipment along the corridor

    Dallas Design District — drying equipment along the corridor

  • Dallas Design District — wet hardwood in the chandelier suite

    Dallas Design District — wet hardwood in the chandelier suite

  • Fort Worth — failed cast-iron fitting pulled from the dirt

    Fort Worth — failed cast-iron fitting pulled from the dirt

  • Fort Worth — dehumidifiers and air movers in a commercial corridor

    Fort Worth — dehumidifiers and air movers in a commercial corridor

  • Fort Worth — drying equipment staged along the wet corridor

    Fort Worth — drying equipment staged along the wet corridor

  • Fort Worth — commercial dehumidifier on the corridor floor

    Fort Worth — commercial dehumidifier on the corridor floor

  • Fort Worth — wet drywall removed at the corridor base

    Fort Worth — wet drywall removed at the corridor base

  • Fort Worth — insulation exposed along the corridor after the wet base came out

    Fort Worth — insulation exposed along the corridor after the wet base came out

  • Fort Worth — air movers on a wet commercial floor

    Fort Worth — air movers on a wet commercial floor

  • Fort Worth — wet trim and debris leaving the building

    Fort Worth — wet trim and debris leaving the building

  • Fort Worth — new insulation going back into the corridor base

    Fort Worth — new insulation going back into the corridor base

  • Fort Worth — hanging drywall at the wet line

    Fort Worth — hanging drywall at the wet line

  • Fort Worth — painting the corridor after the rebuild

    Fort Worth — painting the corridor after the rebuild

  • Fort Worth — installing base trim after the corridor walls went back

    Fort Worth — installing base trim after the corridor walls went back

  • Fort Worth — finished wainscot in the rebuilt corridor

    Fort Worth — finished wainscot in the rebuilt corridor

  • Fort Worth — finished paneled wall after the commercial rebuild

    Fort Worth — finished paneled wall after the commercial rebuild

  • Fort Worth — sheetrock staged for the corridor rebuild

    Fort Worth — sheetrock staged for the corridor rebuild

More jobs