How we work
How PRC restores Fort Worth houses
Emergencies get stabilized the same day. Permanent work waits until we know what the house actually did. The model — document, scope, build — is on About.
This is the job order. Why we work this way, and how it differs from a volume vendor, is on About. If the house is open or still taking on water, call first. The form is for details after the building is stable. Text photos to us.
Protect. Reveal. Construct.
Protect
Secure the property. Board-up, extract, tarp. Stop further damage.
Reveal
Document the building. Readings, photos, opened assemblies. The file the scope is written from.
Construct
Rebuild from that condition — not from a rushed first estimate.
01 Stabilize
Board-up, pull the water, set drying equipment, tarp the roof. Same day when the house is open, wet, or unsafe. Stabilize before anyone writes a rebuild.
02 Document
Photos, moisture readings, framing notes. What’s wet, what’s burned, what’s actually broken. That file is what the scope is written from.
03 Scope
The repair list follows the house — quantities, materials, drying logs, the published restoration process. You get the project file at handoff.
04 Rebuild
Permanent work starts when the assembly is dry enough and the structure is known. Then we schedule it and build from those notes.
05 Verify
Final walkthrough, punch list, project file, owner handoff. The paper matches the house.
What each step looks like on a real job
Stabilize. When a bedroom ceiling came down, we took out what fell and opened what failed before anything else. See bedroom ceiling failure.
Document. On a hall bath, the meter under the vanity read 64.5, which is how we knew the cabinet was wet. See bathroom cabinet drying. Behind a kitchen ceiling, the thermal camera showed where moisture was still sitting. See ceiling opened to dry.
Scope. A two-story house opened to the framing is where the rebuild list gets written. See house opened to framing.
Rebuild and verify. Permanent work starts when the structure is dry enough. Our reconstruction page covers it, and all projects shows more jobs.
Drying does not run on a calendar
We dry until the readings say dry, then we hang. That is why a drying job on our water damage and drying page comes with daily checks, and why our post on documenting water damage before cleanup asks you to take pictures first. If it is happening now, contact us.
Recent articles
All posts
Feb 21, 2026
Slow down. The building is about to be rebuilt.
Dry first. Then hang. The calendar is not the standard.
Slow down. The building is about to be rebuilt.
Jun 28, 2026
The Difference Between Mitigation and Reconstruction in DFW 2026
Mitigation vs Reconstruction: Why the Difference Matters After Property Damage
The Difference Between Mitigation and Reconstruction in DFW 2026
May 12, 2026
The PRC Standard: How We Document Restoration in North Texas
PRC documents the building first, then writes the restoration scope from those conditions. Protect. Reveal. Construct.
The PRC Standard: How We Document Restoration in North Texas